asked 08/13/20Ken can paint in 12 hours, Dwayne can paint in 16 hours how fast can they paint together?
You might want to look at it this way.
rates 1/16 and 1/12. Therefore for time t
1/16 t + 1/12 t = 1 job done. Multiply by 48 and you should get the same answer, a little different approach.
Jon S. answered 08/13/20
Patient and Knowledgeable Math and English Tutor
Ken can do 1/12 of the job in an hour
Dwayne can do 1/16 of the job in an hour
Together they can do 1/12 + 1/16 = 4/48 + 3/48 = 7/48 of the job in an hour.
So to do the whole job would take 48/7 hours = 6.857 hours