Hi Augstina,
takes 4 hours means 1/4 can be filled in 1 hour
takes 7 hours means 1/7 can be filled in 1 hour
1) by the time the tub is full both have been running for equal amount of time t.
2) the amount of water by the hose is equal to (1/4full)(1/hour)(t hour)
3) the amount of water by the drain is equal to (1/7full)(1/hour)(t hour) + 1full
1/4ft = 1/7ft + 1f
1/4t = 1/7t + 1 //dividing both sides by f
t(1/4-1/7)=1
t=1/3/28
t=9.33hours