Aa P.
asked 10/03/19multiple mowers working together
I have 4 mowers and 30 sqmi to mow. how do I optimize how many sqmi each mower has to mow to finish within 50 hours
mower 1 2.23hr/sqmi
mower 2 1.43hr/sqmi
mower 3 5.52hr/sqmi
mower 4 2.95hr/sqmi
1 Expert Answer
Mark M. answered 10/03/19
Mathematics Teacher - NCLB Highly Qualified
Time needed working alone
1) 66.9
2) 42.9
3) 165.6
4) 88.5
t represents the time working together.
(t / 66.9) + (t / 42.9) + (t / 165.6) + (t / 88.5) = 1
628725.24t + 980459.64t + 253995.885t + 475273.656t = 42061718.56
2338454.421t = 42061718.56
t = 17.98697387
Working together the mowers would need slightly less than 18 hours.
Still looking for help? Get the right answer, fast.
Get a free answer to a quick problem.
Most questions answered within 4 hours.
OR
Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.
Aa P.
Or if unable to finish in 50 hours how many sqmi each mower will do to finish in the fastest possible time10/03/19