Aa P.

asked • 10/03/19

multiple mowers working together

I have 4 mowers and 30 sqmi to mow. how do I optimize how many sqmi each mower has to mow to finish within 50 hours

mower 1 2.23hr/sqmi

mower 2 1.43hr/sqmi

mower 3 5.52hr/sqmi

mower 4 2.95hr/sqmi

Aa P.

Or if unable to finish in 50 hours how many sqmi each mower will do to finish in the fastest possible time
Report

10/03/19

Heidi T.

If you have 50 hours, then Mower 2 can finish the job by itself in 42.9 hours. Time to mow = rate (hr/mi^2) * (#sq mi) = (1.43 hr/mi^2)*(30 mi^2) = 42.9 hours. If you want to finish in the shortest possible time period with all 4 mowers working at the same time, with the combined time of operation adding to 50 hours, it's a totally different problem.
Report

10/03/19

1 Expert Answer

By:

Mark M. answered • 10/03/19

Tutor
5.0 (278)

Mathematics Teacher - NCLB Highly Qualified

Still looking for help? Get the right answer, fast.

Ask a question for free

Get a free answer to a quick problem.
Most questions answered within 4 hours.

OR

Find an Online Tutor Now

Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.