 
Lenny D. answered  04/09/19
Former Tufts Economics Professor and Wall Street Economist
MU(a)=b MU(b) =a MU(c) =d MU(d) = c
We Need MU(a)/MU(b) = pa/pb MU(a)/MU(c) = pa/pc MU(a)/MU(d) = pa/pd etc
MRS (ab)= b/a MRS (ac) b/d MRS (ad) b/c.
note pa/pb=1 pa/pc = pa/pd = pb/pc =pb/pd =1/2.
Tangency has b/a =1 or b=a b/c=b/d =1/2 or 2b =c=d
We substitute into the budget constraint
12 = a+b +2c +2d = b + b +2*2b +2*2b or 10b=12 so b = 12/10 a= b =12/10
c and d both = 2b or 2.4
formally,,
a* = 1.2
b*=1.2
c* = 2.4
d* = 2.4
 
     
             
                     
                    