Lets assume their warehouse is 100 ft2 (Could be any any size!)
Then it takes Jen 1 hours to do 10 ft2
So, for both 10 ft2/hr (Jen) x 5.24 hours + C ft2/hour x 5.24 hours = 100 ft2
Solving for Carlos' effort, we get C = 9.084 ft2/hour
So, if he had to do the whole warehouse (100 ft2), his time would be 100/9,084 = 11 hours