Arthur D. answered 02/06/15
Tutor
5.0
(256)
Mathematics Tutor With a Master's Degree In Mathematics
Katherine does 1/24 of the job in 1 hour
Amber does 1/12 of the job in 1 hour, or 2/24 of the job
Jessica does 1/8 of the job in 1 hour, or 3/24 of the job
together they do 1/24+2/24+3/24 of the job in 1 hour, or 6/24 of the job which is 1/4 of the job in 1 hour,
2/4 of the job in 2 hours, 3/4 of the job in 3 hours, and the entire job in 4 hours