How to manage different detail levels in a project plan to be presented to different audiences?

In any given project, a variety of detail levels are needed:- executive summary- technical summary- delivery team summary- delivery detailsHow can these different levels of detail be contained and published in the *same* project plan (specifically using MS Project 2007) ***without*** the "higher levels" being able to drill-into the lower ones?Is it possible with the tool, or would multiple project plans need to be kept to be able to share with the representatives of each level?

1 Expert Answer

By:

John K. answered • 03/17/19

Microsoft Project / Project Online Tutor