Here is a generic way to set up this type of algebra problem.
d = total amount of dirt at the site (tons)
r = rate or removal (tons/hr)
t = time it takes to remove all of the dirt (hr)
d = rt
The total amount of dirt equals the removal rate times hours spent removing all the dirt.
Since you want to solve for t, divide both sides by r
t = d/r
Still looking for help? Get the right answer, fast.
Ask a question for free
Get a free answer to a quick problem.
Most questions answered within 4 hours.
OR
Find an Online Tutor Now
Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.
Edward waters T.
How about adding numbers to the equation. A construction company needs to remove 3 1/6 tons of dirt from a construction site. They can remove 5/8 tons of dirt each hour. How long will take to remove the dirt?12/05/18