Lillian M.

asked • 06/11/14

A construction company needs to remove tons of dirt from a construction site. They can remove tons of dirt each hour. How long will take to remove the dirt?

A construction company needs to remove tons of dirt from a construction site. They can remove tons of dirt each hour. How long will take to remove the dirt?

Edward waters T.

How about adding numbers to the equation. A construction company needs to remove 3 1/6 tons of dirt from a construction site. They can remove 5/8 tons of dirt each hour. How long will take to remove the dirt?
Report

12/05/18

1 Expert Answer

By:

Katherine P. answered • 06/11/14

Tutor
5.0 (665)

Positive, Effective, and Experienced Math Tutor

Still looking for help? Get the right answer, fast.

Ask a question for free

Get a free answer to a quick problem.
Most questions answered within 4 hours.

OR

Find an Online Tutor Now

Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.