Ira S. answered 12/10/15
Tutor
5.0
(298)
Bilingual math tutor and much more
I kind of hate these problems because teachers expect you to use an equation when it is completely unnecessary.
pump 1 can do 1/3 of the job in 1 hour.
pump 2 can 20 1/12 of the job in an hour.
Together they can do 1/3+1/12 = 5/12 of the job in 1 hour.
So 5/12 H = 1 job
so H=12/5 or 2.4 hours.
Hope this helops.