
Joyce H. answered 09/24/14
Tutor
5.0
(71)
Home School Math Teacher and Tutor
88% learning curve:
Time for nth unit = (time for first unit)(n^(ln.88/ln2)
Time for 10th unit = (54)(10^(ln.88/ln2)
Time for 10th unit = 35.316 hours
Total Cost:
Direct Labor: 20 per hour for 35.316 hours = 706.32
Material Cost = 270
Overhead Cost = 1.10*Direct Labor = 1.10(706.32) = 776.95
Total Cost = 1753.27
Maximum Profit Margin to remain competitive: 2053.44 - 1753.27 = $300.17