Cute G.

asked • 12/17/12

how to find this answer using formulation.graphical and primal simplex method???

A tailor can produce ‘’baju kurung’’ and ‘’baju melayu’’ from a single roll of cloth measuring 36 meters a week. A baju kurung uses 6 meters and a baju melayu uses 4 meters of material. Both baju kurung and baju melayu take 6 hours each to be completed. Baju kurung sells for a profit of RM 50 and baju melayu RM 60. If the tailor works for up to 49 hours a week, determine the number each dress that should be produced in order to maximize her profits.a) Formulate the problem as integer programming problemb) Use graphical solution to obtain the optimal linear programming solution

1 Expert Answer

By:

Bill F. answered • 12/17/12

Tutor
5 (1)

Experienced Teacher & Tutor in Round Rock, TX

Cute G.

can you show me the calculation bcoz i not really understnd..tq..:)

Report

12/18/12

Still looking for help? Get the right answer, fast.

Ask a question for free

Get a free answer to a quick problem.
Most questions answered within 4 hours.

OR

Find an Online Tutor Now

Choose an expert and meet online. No packages or subscriptions, pay only for the time you need.